Titus Vertical Basic IOM Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Ekwipunek Titus Vertical Basic IOM. Titus Vertical Basic IOM User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 6
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
Page 1 of 6
INSTALLATION INSTRUCTIONS:
Vertical Basic Fan Coil Series
VBC, VBF, VBA, VBL
INSTALLER MUST BE A TRAINED, EXPERIENCED SERVICE
TECHNICIAN
1. PRESSURE CHECK
The complete unit including coil, valve package and associated piping is shipped
pressurized. Use the air valve to release the pressure. Should there be no pressure,
inspect the unit for possible shipping damage. The unit must be pressure tested again
prior to installation.
2. MOUNTING
2.1 The unit is to be located on a leveled surface at the designated location against a wall
or a solid partition. When leveling legs (optional) are supplied, these are located
under the unit’s legs (2 per leg). Turn the bolts as required until the unit is perfectly
level to ensure proper condensate drainage.
2.2 Once leveled and connected, the unit should be bolted to the back wall in such a
manner that will prevent tip-over. Exception: Due to its wider base, the VBC does not
have to be bolted to the back wall.
3. PIPING
3.1 All piping leading to the unit must be adequately supported to prevent excessive stress
on the unit’s piping. However, sufficient free movement is required for thermal
expansion/contraction.
3.2 Do NOT over-tighten threaded connections.
3.3 Do NOT overheat sweat connection. Use solder (95/5) with a melting temperature
below 600
o
F.
3.4 When the valve package is supplied separately for field installation, carefully follow
the schematic piping diagram and installation instructions provided with the package.
Przeglądanie stron 0
1 2 3 4 5 6

Podsumowanie treści

Strona 1 - VBC, VBF, VBA, VBL

Page 1 of 6 INSTALLATION INSTRUCTIONS: Vertical Basic Fan Coil Series VBC, VBF, VBA, VBL INSTALLER MUST BE A TRAINED, EXPERIENCED SERVICE TEC

Strona 2 - Page 2 of 6

Page 2 of 6 3.5 All pipes and fittings that extend beyond the drain pan MUST be insulated. 3.6 The inlet and outlet points are clearly marked o

Strona 3 - INITIAL START-UP

Page 3 of 6 5. ELECTRICAL 5.1 All electrical connections are to be made in accordance with the National Electric Code, state and local codes, b

Strona 4 - INSTRUCTIONS:

Page 4 of 6 OPERATING & MAINTENANCE INSTRUCTIONS: Vertical Basic Fan Coil Series VBC, VBF, VBA, VBL 1. OPERATION AND CONTROL 1.1 The

Strona 5 - Page 5 of 6

Page 5 of 6 2.1.1 No tools are required to remove the filter on VBC, VBF, and VBA. Pull the filter down from underneath the front panel (the fil

Strona 6 - 605 Shiloh Road

Page 6 of 6 2.7.1 Disconnect all power sources before attempting to open the unit. Check all electrical wiring to ensure the unit is fully isolated.

Komentarze do niniejszej Instrukcji

Brak uwag