Titus ZECV IOM Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Ekwipunek Titus ZECV IOM. Titus ZECV IOM User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 4
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
Constant Volume Rooftop Unit
Supply
Air
Bypass
Air
Return
Air
Zcom
ZECV
Static
Pressure
Tap
Installation Manual
ZECV-IOM-1.0 3-1-03
Installation, Operation & Maintenance of the ZECV
Analog Pressure Controller
General Description
When applying Zcom diusers in an changeover/
bypass application with a constant volume rooftop
unit, provisions must be made to control duct static
pressure. The duct static pressure is typically
controlled by a system bypass damper installed o
of the supply duct, and controlled from a static
pressure tap installed 2/3 down the main duct.
Figure 2 illustrates a re commended installation of
the bypass damper to maximize mixing of the
bypass air with the return air. This location of the
bypass minimizes the opportunity for developing
hot or cold spots in the rooftop.
Installation Instructions
These instructions are intended only as a basic
guide for the installer. They do not assure
compliance with local codes. Consult the
authorities having jurisdic tion be
fore installing this
terminal.
Receiving Inspection
After unpacking the pressure controller, check it for
shipping damage. If any shipping damage is found,
report it immediately to the delivering carrier.
Supporting the Terminal
The basic control is light enough so that it can be
supported by the duct work in which it is installed.
Where the accessory modules such as coils,
attenuators or multiple outlets are included, the
assembly should be supported directly. Use the
support method prescribed for rectangular duct in
the job specications.
Duct Connections
Slip the inlet duct over the inlet collar.
The diameter of the inlet duct in inches must be
equal to the listed size if the terminal: e.g., a duct
that actually measures 8 in ches must be tted to a
size 8 terminal. Attach the
rectangular outlet duct
by using standard SMACNA slip and drive
connection method. Fasten and seal all
connections by the method prescribed by the job
specications.
Figure 2.
Figure 1. ZECV
Przeglądanie stron 0
1 2 3 4

Podsumowanie treści

Strona 1 - Installation Manual

Constant Volume Rooftop UnitSupplyAirBypassAirReturnAirZcomZECVStaticPressureTapInstallation ManualZECV-IOM-1.0 3-1-03Installation, Operation & Ma

Strona 2 - Field Wiring Instructions

ZECV-IOM-2.0 3-1-03Field Wiring InstructionsInspectionFactory mounted controls and accessories are mountedinside the sheet metal enclosure located on

Strona 3 - Replacement Parts

ZECV-IOM-3.0 3-1-03Replacement PartsDESCRIPTION MODEL # TITUS PART #Controller-Actuator-Sensor(Sizes 4–10) CEP-4011 100277-01(Sizes 12–16) CEP-4012 10

Strona 4 - Service Procedure Check Sheet

ZECV-IOM-4.0 3-1-03Service Procedure Check SheetI. Verify all wires are tightly secured to the proper terminals. CAUTION: Do NOT touch terminals with

Komentarze do niniejszej Instrukcji

Brak uwag